2011


In April, a new assembly and processing workshop (with a factory area of 50000 square meters) was built, and the equipment production line was technically renovated, including the chassis, loading line, assembly production line test bench, and advanced spray painting assembly line (one spray, two coatings, and one drying). This improved assembly production efficiency and reduced labor costs.
In September, the new product CT240 excavator was successfully developed and went offline
In November, it was rated as a high-tech enterprise and the CARTER hydraulic excavator product was awarded the honor of "Shandong Famous Brand";
In December, 36 tons of excavators were taken off the production line, and national agents and suppliers were invited to visit Carter Company for a ribbon cutting ceremony at the scene of the Daikong offline ceremony.